Final Up to date: March 01, 2024, 17:33 IST

Pune Metro: Ruby Hall To Ramwadi Stretch Ready For Launch Next Week, Yerawada Station To Follow Soon. (Photo: Big Property)(Representational Image)

Pune Metro: Ruby Corridor To Ramwadi Stretch Prepared For Launch Subsequent Week, Yerawada Station To Comply with Quickly. (Photograph: Large Property)(Representational Picture)

Pune Metro is all set to roll out its prolonged service subsequent week, with Yerawada station anticipated to affix the community after mandatory building concludes.

Pune Metro is all set to launch the much-awaited Ruby Corridor to Ramwadi stretch subsequent week, all whereas bracing for the upcoming Lok Sabha polls’ election code of conduct.

Regardless of preliminary plans, Yerawada station won’t be a part of the preliminary launch, responding to calls for for swift implementation from keen commuters.

The development for the Ruby Corridor to Ramwadi stretch has been accomplished, and security permissions have been granted.

Initially slated for inauguration by Prime Minister Narendra Modi on February 19, the occasion was postponed, main Pune Metro to request state authorities permission for a comfortable opening, with a proper dedication ceremony to observe. Regardless of expectations for a web-based inauguration on February 25, the occasion didn’t occur, as reported by Hindustan Instances.

Anticipating the upcoming election code of conduct, Pune Metro is now set to inaugurate the stretch subsequent week, presumably on March 6. Atul Gadgil, the director (works) of the Maharashtra Metro Rail Company Restricted (Maha-Metro), confirmed preparations for the inauguration, stating it could be performed through video convention with Prime Minister Narendra Modi.

The expanded metro service, initially launched on August 1 final yr, spans a 9.7 km route from Vanaz to Ruby Corridor, with extensions but to be operational. The forthcoming Ruby Corridor to Ramwadi stretch, masking 5.5 km and that includes stations like Bund Backyard, Kalyani Nagar, and Ramwadi, marks a vital addition to the 15.7 km Vanaz to Ramwadi route.

Nonetheless, commuters ought to be aware that when passenger operations start on the Ruby Corridor to Ramwadi stretch, Yerawada station won’t be operational. Because of delayed building of 1 entry-exit level, the station’s opening is deferred till completion, anticipated in a couple of month.

Atul Gadgil emphasised, “We determined to not open Yerawada station for passengers on the Ruby Corridor to Ramwadi stretch. We are going to open it after completion of the second entry-exit level of Yerawada station.”

With 4 stations alongside the Ruby Corridor to Ramwadi stretch, the joy amongst commuters is palpable. Whereas the Yerawada cease is likely to be delayed, the journey from Bund Backyard to Ramwadi guarantees to be a big step ahead for Pune’s metro community.

LEAVE A REPLY

Please enter your comment!
Please enter your name here